Construct drain & New Sump Pit for ISO tanker | |
Excavation, Backfilling and Re-instatement of 300mm diameter FRP Pipe Laying | |
Rc Wheel Stopper and Thermal Plastic ISO Truck Lot Painting | |
FRP UG pipeline/Cable Duct Bank Works | |
Fire rated wall and door installation as per SCDF | |
Concrete Slab with Coring Works | |
BCA/SCDF Authority submission - PE Calculation etc., |